Unimog Museum Extension

On January 28, 2023, the Unimog Museum opened the doors of its new extension to visitors.

The façade of the ten-meter-high new construction consists of a multi-layered timber stud wall with ventilated Douglas fir cladding. Thanks to this extension of 1,150 square meters, the exhibition space has more than doubled. 

Construction costs:

€5 million

Gross
floor area:

1520 m2

Neubau Museum
Audi Small Series Production Building
Fiducia New Production And Administration Building
BMW New Assembly Hall
Unimog Museum Extension