Unimog Museum Workshop

A workshop for the maintenance and repair of the exhibition vehicles was built adjacent to the Unimog Museum.

The exposed concrete and sandwich elements on the first floor reflect the suspended timber façade of the existing building.

Construction costs:

€5 million

Gross
floor area:

1520 m2

Neubau Museum
Haribo New Production, Logistics And Head Office
Fiducia New Production And Administration Building
Magna Production Building Master Plan
Motel One